View Single Post
  #7  
Old July 28th 2004, 12:17
Rob's Avatar
Rob Rob is offline
Registered User
 
Join Date: Jan 2003
Location: Dundas, Ontario, Canada
Posts: 786
Cool. Good turnout !

Anyway, I'm doing fuel pump and lines now.
Wiring is done (I hope), just need to wire up the fans and get a temp gauge.
Mount the muffler and O2 sensor.
Then I need to hook up the cooling, and I should be able to start it..

But before I can drive it I need to build the rad shroud, and redo the throttle linkage..... that's all....

Rob.
__________________
EJ25 powered 1970 Standard Beetle
Subaru EJ25 in 1970 Beetle Project
Reply With Quote