| 
			
			Well I fired it up today and went thru the first 30 minute nail chewing break-in run. the right side carb needs some work but I was not going to stop the break-in for it. I just shut it down and it is cooling off. I will have a look at the lifters after it is good and cooled down. Might bolt on another good set of 45 dells I have before running it again.It was one of the longest 30 minutes I have been thru.
 
				__________________NO_H2O
 72 1302 Smack Black GL
 73 Bus (2L CIS Powered)
 66 Beetle, 73 Standard Beetle
 72 Pinzgauer 710M
 Volksport Kafer Gruppe
 |