![](http://i7.photobucket.com/albums/y256/equilibrio/IMG_0153.jpg~original)
Gearbox is ready to go. Bearing preload and backlash are set on the spool.
![](http://i7.photobucket.com/albums/y256/equilibrio/IMG_0154.jpg~original)
I "deconstructed" my OEM front mount and found the date of manufacture was cast into the piece
![Shocked](images/smilies/shocked.gif)
. I am going to mill down the face and resuse this piece as a solid front mount.