Outline:
Green = Done
Blue = Parts Obtained
Red = Not Done
Phase 1 Suspension
- ball joint and tie rod end replacement
- KYB soft ride gas shocks
- Front and rear 3/4" swaybar
Interior
- Locate gas smell
- Better front seats
- Begin mock up of dash panels (3d print test fits?)
- Install lighter port
Misc
- Full inspection of electrical system
- Repair turn signal switch
- Upgrade headlights/install stealth light bar
Phase 2 944 Conversion
- Obtain donor parts
- Have front spindles and hubs machined and order replacement rotors and pads
- Decide on MC
- Finalize wheels and tires
- Install Conversion
Exterior
- Black out Trim and smoke light covers
- Wolfsburg emblems for wheels
- Front damn
- Fastback Window Cover (?)
Interior
- Walnut Steering Wheel
- Walnut Formula Vee Shifter
- Make Dash Panels
Phase 3 Body Off Restoration
- Fix all Rust
- Patch Paint/Repaint
- Replace Cracked Dash pad
- Install New Carpet
Drive train
Last edited by eskamobob1; August 2nd 2018 at 17:45.
|