View Single Post
  #125  
Old January 6th 2012, 17:31
fahrvergnugen fahrvergnugen is offline
Registered User
 
Join Date: Jun 2009
Location: The Netherlands
Posts: 285
Took the doors from the attic and dismantled them (they weigh a ton with all the windows etc.).
trail fitted the left door, fixated it with the wright gabs and made the first welds


When the right door is fixated and the pillar is tackwelded as well, I will start on the window surrounding.

Paul.
__________________
If some is good and more is better, then too much should be just about right!
Reply With Quote