View Single Post
  #143  
Old January 4th 2010, 12:13
V8SuperBeetle's Avatar
V8SuperBeetle V8SuperBeetle is offline
Registered User
 
Join Date: Oct 2007
Posts: 220
I got some more work done this weekend.

I spent I good amount of time searching for the right radiator hoses to button up the plumbing on the car. I also got all the PCV, vacuum and rubber fuel line ready to go. I still need to run a gas line from the tank to the pump though. I also installed the steering box, the steering column (to see how things line up once again), and I mocked up my master cylinder, brake pedal and gas pedal (forgot to take pictures of that. I'll get some up soon). Last but not least, I got the starter installed.

Here are some pics with the hoses tightened and ready for the first start up which is yet to come.








Here you can see I need to get a different water neck because it makes it want to stick up. I found a 360º water neck from Summit I'm going to order. That way I can angle the hose further away from the engine and so it'll tuck under the hook nicely. I'll have to think of a way to secure it which wont be much of a problem.

Here's the 360º neck.









I installed the steering box and drilled a hole so the steering shaft came go through the firewall. The steering wheel mounts in the stock location.






Here you can see where the master cylinder will be. I was mocking up the pedal placement and found that because the foot space is so tight I'll have to gas with the right foot and brake with the left foot. That's how you power brake it anyways. I also plan to just completely cut out the wiper engine compartment. It's really not needed.

More soon.

Reply With Quote