GermanLook Forums  

Go Back   GermanLook Forums > General > Project Builds

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old December 2nd 2007, 13:48
Humble's Avatar
Humble Humble is offline
Registered User
 
Join Date: Jan 2003
Location: Boulder Creek, CA
Posts: 758
Oh man time flies, there has been progress but not as much as I'd like. Most of the stuff happening isn't picture worthy and some is but I haven't taken the pictures yet. A lot of wiring and test ideas that were a $200 gamble, some worked and some didn't. I haven't had a lot of time between turkey day, becoming a new uncle, and planning an early xmas for the newborn/family while everyone is together. Some of it is my fault too I'll admit I got a new toy and I'll put up a new post elsewhere for it.

On this project though, here's whats been happening:

Got a new intake from an ej25, larger TB and different layout, so i've modified it to make it work.
Wiring is the bane of my existence, everytime I think I've thought of everything a new circuit is needed.
Took some parts to a machinist to modify for megasquirt and edis, also getting the top water manifold modified so i can spin it around backwards.
Reply With Quote
 


Currently Active Users Viewing This Thread: 18 (0 members and 18 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 13:47.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
© www.GermanLook.net 2002-2017. All Rights Reserved