GermanLook Forums  

Go Back   GermanLook Forums > Clubs From Around The World > VolkSport Käfer Gruppe

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old November 4th 2003, 23:51
Pillow's Avatar
Pillow Pillow is offline
Registered User
 
Join Date: Oct 2002
Location: Gainesville, VA USA
Posts: 639
To do. To do! To do!!! %&#(*^#(

Oh my the list to be accomplished IF this bus is ready for Tampa.

- 2 tires for the rears
- Weld in and allign rear control arm mounts. Not easy at all!
- find two eccentric bolts for the 944 arms swingplate adjusters. (burried somewhere I think in the basement)
- Junkyard for a good pass heat exchanger and rear IRS bearing spacer.
- Tune engine and carbs.
- Unsure on the exact needs for the emergency brakes. Custom for sure.

The good:
- Tranny ready for action.
- Axles ready and T2 CVs.
- All the little stuff there and ready minus the 3 little things above. Tires I do not see as an issue at all.

Additional work needed later:
- new front tie rod ends.
- allignment on a professional machine for front and rear.
- Heater cables installed.

Arg is this fun? Sick I tell you!

Later,
__________________
Adrian Pillow
'57 Oval Beetle - project
'66 VW Westfalia - GL
'96 GMC Sierra Crew Cab 6.5L Diesel
'99 GMC Suburban 6.5L Diesel
VolkSport Kafer Gruppe
Reply With Quote
 


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 02:19.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
© www.GermanLook.net 2002-2017. All Rights Reserved