![]() |
#5
|
||||
|
||||
I can take care of a couple measurements, most likely the rabbit/super struts and possibly the strut bearings as well. Another way about this if I can provide you with a drawing (via paper/pdf) could you turn it into a cad drawing? Time wise I would like to get this moving fairly quickly and if possible get the first proto by the end of May.
I fully expect at least one or two proto runs before there's a finished product and I have the means to get accurate alignment measurements for little or no cost. |
Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
|
|