![]() |
|
#11
|
||||
|
||||
|
Quote:
Thanks guys, I think I'm still on target for it running sometime in the spring. It will be a rolling monstrosity, but I'll leave it rough till all the tweaks are done then rip it apart and make it look purdy. I just got a call from Bruce at Eyeball Engineering and he's done with my chassis stiffeners, so apparently those will be shipped out shortly. $450 for 2 sets of jig bent stiffners and hardware ain't too bad I don't think. If you have been following along, I tried to build my own a long time ago and it was really difficult and not nearly as strong as jig bent ones, so I'm very happy to part with the cash. Jason
__________________
If I could just get paid for my sleepless nights.... 1960 VW Bug UBRDUB Walkaround 1st Drag Run Dyno Run Oval Ragster-'57 Rag/'04 Boxster S |
| Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
|
|