GermanLook Forums  

Go Back   GermanLook Forums > General > Project Builds

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old January 24th 2011, 13:35
vw1303's Avatar
vw1303 vw1303 is offline
Registered User
 
Join Date: Sep 2002
Location: Vancouver BC
Posts: 196
I have nearly my entire spare well cut out so I think there is lots of room for the hot air to go. But time will tell I guess.
A little more progress.

Got my ECU.

Starting stripping the original wiring harness. The manual from EMS is quite vague so I have alot of work to do in the wiring department.

Coolant pipes are all welded and beadrolled. I have all my clamps and hose couplers. Started laying out the fuel system. Bosch 044 being fed by a Facet low pressure pump through a surge pot and out to the injectors. I am going to mount the fuel pump at the back of the spare tire well using some leftover 2.5" silicone couplers and clamps to reduce vibration. The surge pot is going to go next to the driver side front strut.

Stage III Pressure Plate and Clutch is arriving today and so is Innovative wideband.
Reply With Quote
 


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 18:04.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
© www.GermanLook.net 2002-2017. All Rights Reserved